Sample project (DEMO): the developer, project, prices and units are fictitious. It shows how TRESVON works; none of this is for sale.

Atrio 4, photo 1
Sample illustrative images
Atrio 4, photo 2
Atrio 4, photo 3
Atrio 4, photo 4
Atrio 4, photo 5
Move-in ready

Atrio 4

Zona 4, Guatemala

A Grupo Constructor Modelo (demo) project, listed on TRESVON. The developer is responsible for the information and the sale.

Apartamentos terminados para mudarse ya, en una calle peatonal de Zona 4 con cafés y oficinas.

From (GTQ)
Q 690,000
Types
Apartment · Retail space · 0 – 2 bedrooms
Delivery
Immediate
Units
3 of 4 available

For your everyday life

What living here gives you

  • Mudarte este mes

    El edificio está terminado: no hay riesgo de atraso en la entrega.

    Backed by: Entrega realizada en junio de 2026.

  • Todo a pie

    Cafés, restaurantes y oficinas en las calles peatonales de Zona 4.

    Backed by: A menos de 5 minutos caminando (estimado).

  • Estudios desde 38 m² útiles

    Una entrada accesible para vivir solo o para alquilar.

    Backed by: Lista de precios de la desarrolladora.

About the project

Edificio de 12 niveles terminado en 2026 con estudios, apartamentos de 1 y 2 dormitorios y locales en el primer nivel. Entrega inmediata: se compra con crédito bancario o fondos propios. (Proyecto de ejemplo: no está disponible.)

Price list

Units, prices and floor plans

Filter by bedrooms, area and budget. Tap a floor plan to enlarge it and ask about the unit you like.

Prices and statuses reported by Grupo Constructor Modelo (demo) on Oct 1, 2026. Not real-time availability: confirm them in your inquiry.

4 of 4 units

  • Available (3)
  • Reserved (1)
  • Sold (0)
  • Status not reported
  1. L111 avail.
  2. L10—
  3. L9No units listed
  4. L8No units listed
  5. L71 avail.
  6. L6No units listed
  7. L5No units listed
  8. L4No units listed
  9. L31 avail.

Building diagram based on the developer's price list: not a facade drawing, and statuses are not updated in real time.

Location and surroundings

Living in Zona 4, Guatemala

Zona 4 está entre el Centro y Zona 10: se llega caminando a restaurantes y oficinas, y hay buses sobre la Avenida Reforma.

Address: Zona 4, Guatemala (approximate location; the developer gives the exact address)

Near the project

  • Transport

    • Paradas de bus cercanas≈ 8 min walking
  • Shops

    • Cafés y restaurantes de Zona 4≈ 3 min walking
  • Education

    No information

  • Health

    • Hospitales de Zona 10≈ 10 min by car
  • Green spaces

    • Plazas peatonales del barrio≈ 4 min walking

Times estimated by the developer for the stated mode; they vary with traffic and time of day.

Shared spaces

Building amenities

What belongs to the project and its residents use. Images marked as renders are illustrative.

  • Terrace

    Terraza común en el último nivel.

  • Business center

    Área de cowork en el primer nivel.

  • Elevator

    Dos ascensores.

Also: 24/7 security

Shops, schools, health care and parks belong to the neighborhood, not the building. See the surroundings

Financing and costs

How you pay

The payment plan published by the developer and, separately, the costs added to the unit price.

Payment plan

No information: the developer didn't publish a payment plan. Ask in your inquiry.

Known additional costs

Added to the unit price; not included in it.

Cuota de mantenimientoPor m² al mes.Q 14 per m² per month

The simulator needs a published payment plan and units with prices.

TRESVON doesn't grant loans or set rates. To finance the balance, ask your bank.

Developer and progress

Grupo Constructor Modelo (demo)

Segunda desarrolladora ficticia para comparar proyectos de distintas empresas en TRESVON. Sus proyectos y unidades no existen.

Founded in
2009
Official site
No information

Delivered projects

  • Villas del Cerro (ejemplo) · San Lucas Sacatepéquezdelivered in 2016 · 36 units

Track record reported by the developer. TRESVON doesn't verify it independently.

Construction progress

Move-in ready
Reported progress100 %
Delivery
Immediate
Last update
Jun 1, 2026
Building permit
No information
  1. Jun 1, 2026

    Edificio entregado

    Obra terminada y primeras unidades entregadas.

Progress reported by Grupo Constructor Modelo (demo). Estimated dates may change; confirmed ones are labeled as such.

Other projects by Grupo Constructor Modelo (demo)

Inquiry and visit

Ask for information or book a visit

Grupo Constructor Modelo (demo) receives your inquiry and will contact you to answer or arrange a visit to the sales office or model home.

For now this project only receives inquiries through the form.

Asking about

Atrio 4

Grupo Constructor Modelo (demo), the project's developer, receives it. TRESVON only puts you in touch.

Sample project: you can try the form, but nothing is sent.

I want

Frequently asked questions

What people usually ask

¿Cuándo me puedo mudar?

El edificio está terminado. La entrega depende de la firma y del crédito, si lo usas.

¿Hay plan de pagos?

Sin información: la desarrolladora no publicó un plan. Pregúntalo en tu consulta.

¿Quién me responde la consulta?

La desarrolladora del proyecto. TRESVON le hace llegar tu consulta.

Answers reported by Grupo Constructor Modelo (demo).

Keep looking

Similar projects

Chosen by area, budget (±30%), property type or delivery date (±1 year). The reason shows on each; sponsored ones are labeled.

Atrio 4

Q 690,000

UnitsAsk